6K Energy to spend $250,000,000.00 to expand into new space in Jackson Tennessee.
Jackson, Tennessee — According to state and local development sources, 6K Energy plans to invest $250,000,000.00 to build out new space in Jackson. The company plans to occupy the new space in Jackson, on or about March 1, 2025. According to the company website 6Ks UniMelt microwave plasma develops advanced materials across a wide spectrum of markets including metal powders for additive manufacturing and advanced materials for battery storage. Its positioned to replace todays traditional processes, which are environmentally unfriendly. 6K overcomes these limitations, delivering a significantly lower cost, more sustainable approach. 6K Additive and 6K Energy In additive manufacturing, the UniMelt utilizes materials like CNC scrap and turns it into premium powder. With close to 100% yield, energy is saved and waste eliminated throughout the process. Competing technologies create 70-75% scrap and are forced to either send it to landfill or put it back into the supply chain, increasing energy and carbon waste dramatically. Its a similar story with battery materials. Traditional processes generate large amounts of pollutants, consume huge quantities of water, use energy-intensive processes and take 2-3 days for production. The UniMelt produces material in 1-2 seconds, produces zero hazardous waste, achieves a 6X reduction in water usage, and a 3x reduction in power usage and CO2 emissions.
To learn more about 6K Energy, visit http://www.6kinc.com/
Company Contact:
Sam Trinch, President
strinch@6kinc.com
https://www.linkedin.com/in/sam-trinch-b8a38714/
978-258-1645
SOURCE: http://www.intelligence360.io
Copyright (c) 2023 SI360 Inc. All rights reserved.